☑ MCQ PRACTICE

DevOps Unit 1

Practice objective questions for quick revision and examination preparation. Try answering each question before revealing the answer.

📚 DevOps
📖 Unit 1
🎯 MCQs

DevOps - Unit-1

1
DevOps is a combination of which two practices?
ADesign and Output
BData and Operations
CDevelopment and Optimization
DDevelopment and Operations
Correct Answer Development and Operations
2
Which Agile framework organises work into fixed-length iterations called sprints?
AScrum
BWaterfall
CSpiral
DV-Model
Correct Answer Scrum
3
In Scrum, who is responsible for maximizing the value of the product and managing the product backlog?
AScrum Master
BDevelopment Team
CProject Sponsor
DProduct Owner
Correct Answer Product Owner
4
Which technique does Kanban use to avoid overloading the team?
AFixed sprint length
BDaily code freeze
CMandatory pair programming
DWork-in-progress (WIP) limits
Correct Answer Work-in-progress (WIP) limits
5
A basic Kanban board typically has which columns?
APlan, Design, Test
BBacklog, Sprint, Release
CCode, Build, Deploy
DTo Do, In Progress, Done
Correct Answer To Do, In Progress, Done
6
In which year was the Agile Manifesto published?
A1995
B2005
C2010
D2001
Correct Answer 2001
7
What does ITIL stand for?
AInternet Technology Integration Layer
BInformation Transfer and Integration Language
CInformation Technology Infrastructure Library
DIntegrated Technology and Infrastructure Logic
Correct Answer Information Technology Infrastructure Library
8
Continuous Delivery ensures that software can be
Areleased to production reliably at any time
Bwritten without testing
Cdeployed only once a year
Dbuilt only by operations staff
Correct Answer released to production reliably at any time
9
The practice of frequently merging code changes into a shared repository, verified by automated builds, is called
AContinuous Monitoring
BContinuous Planning
CContinuous Billing
DContinuous Integration
Correct Answer Continuous Integration
10
Which of the following is NOT a typical stage of a delivery pipeline?
ABuild
BMarketing campaign launch
CAutomated testing
DDeployment to staging
Correct Answer Marketing campaign launch
11
A bottleneck in a delivery pipeline is
Athe fastest stage of the pipeline
Bthe stage that limits the overall throughput
Ca tool used to deploy code
Da type of automated test
Correct Answer the stage that limits the overall throughput
12
Lead time in a delivery pipeline measures
Athe length of a daily meeting
Bthe time a build server is idle
Cthe time from a code commit to running in production
Dthe number of defects per release
Correct Answer the time from a code commit to running in production
13
Release management is
Awriting source code for new features
Bmonitoring network hardware
Cplanning, scheduling and controlling software releases through different environments
Drecruiting development staff
Correct Answer planning, scheduling and controlling software releases through different environments
14
Which Scrum event is a short daily meeting of about 15 minutes?
ASprint Review
BSprint Retrospective
CBacklog Grooming
DDaily Scrum (stand-up)
Correct Answer Daily Scrum (stand-up)
15
What is the role of the Scrum Master?
AFacilitate the Scrum process and remove impediments
BWrite all the code
CDecide the product features
DApprove production releases
Correct Answer Facilitate the Scrum process and remove impediments
16
A Scrum sprint typically lasts
A1 to 4 weeks
B1 to 4 days
C6 to 12 months
DExactly one year
Correct Answer 1 to 4 weeks
17
Which model completes each phase fully before the next phase begins?
AScrum
BKanban
CWaterfall model
DExtreme Programming
Correct Answer Waterfall model
18
DevOps culture mainly emphasises
Aseparating development from operations
Bmanual deployments
Clong release cycles
Dcollaboration between development and operations teams
Correct Answer collaboration between development and operations teams
19
ITIL is mainly concerned with
Adatabase design
Bmobile app development
Ccomputer graphics
DIT service management
Correct Answer IT service management
20
Continuous Deployment differs from Continuous Delivery because in Continuous Deployment
Aevery change that passes the tests is deployed to production automatically
Bno tests are executed
Creleases need manual approval every time
Donly the operations team writes code
Correct Answer every change that passes the tests is deployed to production automatically
21
Which Scrum artifact is an ordered list of everything needed in the product?
AProduct Backlog
BBurndown chart
CSprint Review
DRelease note
Correct Answer Product Backlog
22
Kanban originated from
Athe Waterfall model
Bthe Toyota Production System
CITIL
Dthe Spiral model
Correct Answer the Toyota Production System
23
The main benefit of an automated delivery pipeline is
Amore manual approvals
Bfaster, repeatable releases with fewer manual errors
Clonger release cycles
Dno need for testing
Correct Answer faster, repeatable releases with fewer manual errors
24
Which of the following is a common bottleneck in a delivery pipeline?
AAutomated unit tests
BVersion control
CFast builds
DSlow manual testing and approvals
Correct Answer Slow manual testing and approvals
25
Value stream mapping is used to
Avisualise the flow of work and identify delays and waste
Bwrite source code automatically
Cencrypt deployment files
Ddesign databases
Correct Answer visualise the flow of work and identify delays and waste

Fill in the Blanks

26 DevOps is a combination of Development and __________.
Correct Answer Operations
27 A time-boxed iteration in Scrum is called a __________.
Correct Answer Sprint
28 Kanban limits the amount of __________ in progress (WIP).
Correct Answer work
29 ITIL stands for Information Technology __________ Library.
Correct Answer Infrastructure
30 __________ ensures that software is always in a releasable state.
Correct Answer Continuous Delivery
31 The Scrum role that owns the product backlog is the __________.
Correct Answer Product Owner
32 The Daily Scrum meeting lasts at most __________ minutes.
Correct Answer 15
33 The Agile Manifesto was published in the year __________.
Correct Answer 2001
34 A __________ pipeline automates the stages from code commit to release.
Correct Answer delivery
35 The stage that limits the overall flow of a pipeline is called a __________.
Correct Answer bottleneck
36 In Kanban, work items are represented by __________ on the board.
Correct Answer cards
37 __________ management plans, schedules and controls the release of software through environments.
Correct Answer Release
38 In the __________ model, development phases follow one after another without overlapping.
Correct Answer Waterfall
39 The Sprint __________ meeting reviews what went well and what can be improved.
Correct Answer Retrospective
40 The time between committing code and running it in production is called __________ time.
Correct Answer lead
← Back to All MCQs