1

The Capability Maturity Model (CMM) was developed by the

A Software Engineering Institute (SEI)
B IEEE
C ISO
D Project Management Institute
Correct Answer Software Engineering Institute (SEI)
2

The number of maturity levels in the CMM is

A three
B five
C four
D seven
Correct Answer five
3

Level 1 of the software process maturity framework is called

A Initial
B Repeatable
C Defined
D Managed
Correct Answer Initial
4

Level 2 of the software process maturity framework is called

A Initial
B Defined
C Optimizing
D Repeatable
Correct Answer Repeatable
5

Level 3 of the software process maturity framework is called

A Repeatable
B Defined
C Managed
D Initial
Correct Answer Defined
6

Level 4 of the software process maturity framework is called

A Defined
B Optimizing
C Repeatable
D Managed
Correct Answer Managed
7

Level 5 of the software process maturity framework is called

A Managed
B Defined
C Optimizing
D Initial
Correct Answer Optimizing
8

At the Initial level, the software process is

A fully measured
B continuously optimised
C documented organisation-wide
D ad hoc and chaotic
Correct Answer ad hoc and chaotic
9

The Repeatable level focuses on

A quantitative process control
B basic project management of cost, schedule and functionality
C continuous process optimisation
D technology change management
Correct Answer basic project management of cost, schedule and functionality
10

The level at which the software process is documented, standardised and integrated across the organisation is

A Defined
B Initial
C Repeatable
D Managed
Correct Answer Defined
11

The level at which detailed measures of the software process and product quality are collected is

A Managed
B Initial
C Repeatable
D Defined
Correct Answer Managed
12

The level at which continuous process improvement is the focus is

A Repeatable
B Defined
C Initial
D Optimizing
Correct Answer Optimizing
13

Which of the following is a key process area of Level 2 (Repeatable)?

A Defect prevention
B Software configuration management
C Peer reviews
D Quantitative process management
Correct Answer Software configuration management
14

Which of the following is a key process area of Level 5 (Optimizing)?

A Requirements management
B Defect prevention
C Training program
D Software project planning
Correct Answer Defect prevention
15

Which of the following is a key process area of Level 4 (Managed)?

A Quantitative process management
B Organization process focus
C Software quality assurance
D Technology change management
Correct Answer Quantitative process management
16

CMMI stands for

A Capability Maturity Model Integration
B Common Maturity Model Index
C Capability Management Model Interface
D Control Maturity Model Integration
Correct Answer Capability Maturity Model Integration
17

CMMI provides which two representations?

A Static and dynamic
B Linear and circular
C Manual and automatic
D Staged and continuous
Correct Answer Staged and continuous
18

In the CMMI staged representation, Level 2 is called

A Repeatable
B Managed
C Defined
D Initial
Correct Answer Managed
19

In the CMMI staged representation, Level 4 is called

A Quantitatively Managed
B Managed
C Defined
D Repeatable
Correct Answer Quantitatively Managed
20

PCMM stands for

A Project Cost Management Model
B Process Control Maturity Method
C People Capability Maturity Model
D Personal Capability Measurement Model
Correct Answer People Capability Maturity Model
21

The Personal Software Process (PSP) was developed by

A Barry Boehm
B Walker Royce
C Grady Booch
D Watts Humphrey
Correct Answer Watts Humphrey
22

PSP is aimed at

A individual software engineers
B entire organisations only
C customers
D hardware vendors
Correct Answer individual software engineers
23

The Team Software Process (TSP) is intended for

A a single individual only
B end users
C only the testing department
D teams of software engineers
Correct Answer teams of software engineers
24

According to the principles of software process change, major changes to the process must start

A at the top of the organisation
B with the newest employee
C with the customer
D only in the testing team
Correct Answer at the top of the organisation
25

Software process change should be built on knowledge of

A the competitor's product
B the latest programming language
C the current process
D the marketing plan
Correct Answer the current process

Fill in the Blanks

26 SEI stands for ______.
Correct Answer Software Engineering Institute
27 The CMM has ______ maturity levels.
Correct Answer five
28 Level 1 of the CMM is called the ______ level.
Correct Answer Initial
29 Level 2 of the CMM is called the ______ level.
Correct Answer Repeatable
30 Level 3 of the CMM is called the ______ level.
Correct Answer Defined
31 Level 4 of the CMM is called the ______ level.
Correct Answer Managed
32 Level 5 of the CMM is called the ______ level.
Correct Answer Optimizing
33 CMMI stands for ______.
Correct Answer Capability Maturity Model Integration
34 PCMM stands for ______.
Correct Answer People Capability Maturity Model
35 PSP stands for ______.
Correct Answer Personal Software Process
36 TSP stands for ______.
Correct Answer Team Software Process
37 The Personal Software Process was developed by ______.
Correct Answer Watts Humphrey
38 The two representations of CMMI are staged and ______.
Correct Answer continuous
39 The key process areas of Level 5 are defect prevention, technology change management and ______ change management.
Correct Answer process
40 At the Initial level, the software process is ad hoc and ______.
Correct Answer chaotic